| ACC PSTC – Burn Building Sitework REBID |
Burlington, North Carolina |
PROVIDES SITEWORK FOR AREA WHERE A CLASS A LIVE FIRE PRE-MANUFACTURED TRAINING PROP WITH APPOXIMATELY A 2000SF FOOTPRINT WILL BE LOCATED IN THE CITY OF BURLINGTON TRAINING COMPLEX LOCATED ON 128 QUARRY ROAD. |
07/23/2025 |
View |
| Adron F. Thompson Addition and Renovation |
Hillsborough, North Carolina |
Work includes the renovating the 2,400-square-foot interior of the existing facility; demolishing a previous 1,200-square-foot wood framed addition; replacing the previous addition a new 5,000-square-foot two-story addition for offices and parts storage. A 5,570-square-foot pre-engineered vehicle storage building will be bid as an alternate. |
01/29/2026 |
View |
| Addendum 5 Adron F Thompson Renovation posted 01/27/2026 |
| Celia Phelps Memorial United Methodist Church Renovation |
Greensboro, North Carolina |
The project consists of renovations of a one story facility damaged by fire consisting of approximately 3900 square feet. |
08/14/2025 |
View |
| Addendum 5 Celia Phelps posted 08/13/2025 |
| City of Raleigh Lake Johnson Pool Renovations |
Raleigh, North Carolina |
Renovation to replace finishes, roof, doors, windows, lighiting fixtures, and plumbing fixtures. |
01/08/2026 |
View |
| Addendum 1 Clarification Lake Johnson Pool Renovations posted 01/07/2026 |
| Durham County Administration 1 Building County Legal Department – Suite Renovation |
Durham , North Carolina |
The work contemplated will include Reconfiguration of 732 square feet of office space in the Durham County Administration I Building - County Legal Department |
03/12/2026 |
View |
| Addendum 1 Durham County Legal Suite Renovation posted 03/05/2026 |
| Grimsley High School Toilet Room Renovation |
Greensboro, North Carolina |
Selective demolition work which includes removal of existing plumbing fixtures, piping, partitions, portions of existing concrete slabs and slab prep work. The new work shall include new toilet fixtures, accessories, finishes, ceilings, associated MEP work, door hardware and finishes. Work shall be installed, inspected and approved by Authorities having jurisdiction. |
05/29/2025 |
View |
| Addendum 4 Grimsley Toilet Rooms posted 05/19/2025 |
| Grimsley Senior High School Main Building – Vertical Lifts |
Greensboro, North Carolina |
Provide two new vertical lifts with all associated devices, wiring and conduit shall be installed. Replace 8 pairs of doors in existing frames. One classroom door/frame/transom is to be relocated. Work shall be installed, inspected and approved by the City of Greensboro/Guilford County Fire marshal’s office. |
11/26/2024 |
View |
| Addendum 3 Grimsley HS Vertical LIfts posted 11/22/2024 |
| Guilford County Schools New Security Vestibules |
Greensboro, North Carolina |
Sealed proposals will be received by the Guilford County School System until 2:00 pm on date to be determined at 501 W. Washington Street, Greensboro, NC 27401 and immediately thereafter publicly opened and read aloud, to furnish all materials and labor for the construction of new security vestibules within 10... |
03/05/2025 |
View |
| Clarification 1 GCS Security Vestibules posted 03/04/2025 |
| Homestead-Chapel Hill High School Multi-Use Path Bridge Truss Replacement |
Chapel Hill, North Carolina |
This project involves replacing a bridge truss span that was damaged by a tree that fell. The damaged bridge truss segment is part of a 3 span structure manufactured by Contech Engineering Solutions LLC (Job Number 461813-40). The contractor shall remove the damaged span and install a new replacement truss.... |
11/05/2024 |
View |
| Millbrook Exchange Community Center – HVAC Renovations |
Raleigh, North Carolina |
Replacement of existing air handlers, boiler, condensing units and exhaust fans serving the Millbrook Exchange Community Center. Work includes architectural, plumbing and electrical support for the HVAC system replacements. |
03/25/2025 |
View |
| Addendum 1 Millbrook Exchange posted 03/13/2025 |
| NC A&T State University Bluford Commons |
Greensboro, North Carolina |
Renovation of a portion of the ground floor of the Bluford Library and other work indicated in the Contract Documents. |
12/10/2024 |
View |
| Addendum 1 NCAT Bluford Commons posted 12/03/2024 |
| Orange County Board of Elections Building Expansion |
Hillsborough, North Carolina |
The project includes improvements to the county owned facility at 208 S. Cameron Street in Hillsborough, NC. An approximately1800sf addition will be constructed at the rear of the building in place of an existing terraced courtyard. In addition, a loading dock will be added at the southwest corner of the... |
01/15/2026 |
View |
| Addendum 4 OC Board of Elections posted 01/09/2026 |
| Orange Grove Volunteer Fire Station Office & Bay Addition |
Hillsborough, North Carolina |
The work required for this project shall consist of the removal and repair to the extent indicated herein and on the Drawings. Repair work shall include the following: Exterior work: Grading, construction of new concrete driveway and parking lot, installation of trench drain, new flagpole and ground sign, new landscaping... |
03/12/2026 |
View |
| Addendum 1 Orange Grove Volunteer Fire Station posted 03/09/2026 |
| Seawell Admin Building HVAC Renovation |
Chapel Hill, North Carolina |
HVAC Replacement for Seawell Elementary Admin. Building |
11/04/2025 |
View |
| Addendum 2 Seawell Elementary posted 10/31/2025 |
| Steven Tanger Center for Performing Arts – Founders Room Renovation |
Greensboro, North Carolina |
Work to include but not limited to renovation of an existing office space into a new bar and lounge for the Founders. Area to include a new bar, catering counter, lighting, upgraded finishes, and new furniture. |
11/04/2025 |
View |
| Addendum 1 Tanger Center Founders Room posted 10/28/2025 |
| UNC Chapel Hill 208 Franklin Renovation |
Chapel Hill, North Carolina |
The project includes adding two classrooms, a conference room, private office and renovation of an existing toilet room, along with necessary HVAC upgrades and AV power coordination. |
05/21/2025 |
View |
| Addendum 2 UNC Franklin posted 05/14/2025 |
| UNC Chapel Hill Venable Hall Lower Level Upfit |
Chapel Hill, North Carolina |
Renovation of an existing library space into two teaching labs, social space, and TA Office |
02/03/2026 |
View |
| Addendum 3 UNC Venable Hall posted 01/23/2026 |
| Union Station 2nd Floor Upfit |
Winston-Salem, North Carolina |
Scope of work summary: build out the 2nd floor shell space into a 11,832 SF finished office environment. The building is a former train station and on the National Register of Historic Places. |
04/12/2023 |
View |
| Addendum 3 Union Station posted 04/26/2024 |